System devices and platform upgrade for
the Centralized Control System (SCADA) at
the Operations Control Center (CCO).
Line 2 - Metro de Caracas
Preventive and corrective maintenance duties at
the Operations Control Center and the system's
fixed communication devices.
Line 3 - Metro de Caracas
Installing and commissioning
of the automatic train operation (ATO) system.
Installation of the fiber
optics data transmission network and
the trains' radio communication system.
Line 4 - Metro de Caracas
Supply and installation of the Public Address (PA) and Passenger Information Systems (PIS),
and the PABX and emergency telephony network.
Line 1 - Metro de Los Teques
Technical and field coordination for the train control and communications group. Installing and commissioning
of the SCADA and telecommunication systems.
Metrocable San Austin (cable car)
Installing, testing and commissioning
of telecommunication and
electromechanical (lifts and air conditioning) systems.
On course
Line 2 - Metro Los Teques
Technical and field coordination for the train control and communications group.
Installing and commissioning
of the SCADA and telecommunication systems.
Line 5 - Metro de Caracas
Supply, installation testing and commissioning of
the Closed Circuit TV System (CCTV).
Metrocable Filas de Mariche (cable car)
Supply, installation and commissioning of
fire detection and prevention systems, auxiliary power system, air conditioning and elevators.
Cabletren Bolivariano train
Supply, installation and commissioning of
fire detection and prevention systems, auxiliary power system,
air conditioning and elevators.